$2.1B Sagamore Bridge Project Unveiled: New Pathways, Scenic Overlooks, and Cultural Tributes Planned

July 24, 2026
$2.1B Sagamore Bridge Project Unveiled: New Pathways, Scenic Overlooks, and Cultural Tributes Planned
  • Eminent-domain acquisitions of about a dozen nearby homes are part of the project to clear the way for construction.

  • The Sagamore Bridge is being replaced in a $2.1 billion project to improve safety and traffic flow, with foundational work starting in the spring and construction expected to finish in 2037.

  • MassDOT held a design public hearing in Bourne to present renderings, detailed plans, detours, and traffic management for the Sagamore replacement, and provided an update on the Bourne Bridge.

  • State officials are actively seeking a contractor, with construction of the Sagamore Bridge anticipated to begin in late 2027 or early 2028, while planning for the Bourne Bridge continues but remains unfunded.

  • A barrier-protected shared-use path for pedestrians and cyclists, at least 14 feet wide, will include a mid-point scenic overlook and lighting to minimize residential impact.

  • The project features a 14-foot separated pathway for pedestrians and cyclists, with a lookout bench facing west to enjoy sunsets.

  • In addition to the shared-use path, the plan includes a scenic overlook with canal views for users.

  • Community input emphasized using recycled materials and ensuring inclusive cultural representation, including Aptucxet Trading Post history and Wampanoag perspectives in exhibits and planning.

  • The design aims for an iconic arch and improved arrival experience, with main arches built off-site and crane-installed.

Summary based on 9 sources


Get a daily email with more US News stories

More Stories